Costs and business planning in construction: Knowledge hub
Contents |
Key takeaways
Cost and business planning are vital practices in the construction industry that involve forecasting, controlling, and aligning costs with budgets and business objectives. Different types of cost plans evolve through project stages—from high-level appraisals to detailed final accounts. These plans ensure affordability, cash flow management, and accountability, helping make informed decisions and avoiding cost overruns.
What is cost / business planning ?
Cost planning involves systematically estimating, allocating, and controlling the costs of a construction project over its lifecycle. Business planning expands on this by integrating project costs with broader organisational strategy, funding, and commercial objectives. It is important because it:
- Construction projects involve multiple phases, numerous stakeholders, and unpredictable variables (material prices, labour availability, inflation, planning delays).
- Projects often exceed budgets; structured cost planning helps mitigate this risk arxiv.org.
- Early cost visibility enables targeted value analysis and optimisation before construction begins.
- Regular cost monitoring identifies emerging cost risks, enabling adjustments to contingency and design .
- Detailed cost profiles inform financing strategies, loan drawdown schedules, and funding arrangements.
- A structured cost planning regime with clear reporting ensures clients and stakeholders can monitor spending against approved budgets throughout the project.
Key articles about Cost / business planning
Below are key articles about cost and business planning on Designing Buildings:
Types of cost planning documents:
- Approximate quantities cost plan. Pre-tender, measured quantities from drawings/BIM.
- Bill of quantities. Project-specific measured quantities of the items identified in drawings and specifications.
- Budget. The amount of money available to spend over a period of time, or on a specific thing.
- Contract sum analysis. Agreed cost with contractor.
- Cost planning. A general introduction.
- Elemental cost plan. Breakdown by building element once brief/design is formed.
- Final account. Agreed final cost post-completion.
- Initial cost appraisal. Early feasibility & affordability.
- Life cycle costing. Systematic evaluation of combined capital, operating and end-of-life costs.
- Order of cost estimate. Early affordability assessments.
- Pre-tender estimate. Estimated during tender documents preparation.
- Statement of need. The client's possible requirements in outline.
- Tender pricing document. Provided to bidders.
- Whole life cost plan. Assesses total lifecycle and operational costs.
Cost planning processes and control:
- Benchmarking. Comparing your project’s metrics with those of similar projects to identify areas for improvement.
- Capital costs. One-off outlays for acquiring or constructing long-term assets.
- Cash flow. A temporal breakdown of expected cash inflows and outflows across the project lifecycle to monitor liquidity.
- Change control. A formal system to manage modifications to project scope, plans, or specifications in a controlled manner.
- Construction costs. Expenditures directly related to the building process, including materials, labour, plant, and contractor services.
- Contingency. Allowances for uncertainties and risks in cost plans.
- Cost benefit analysis. Details comparing monetary benefits and costs to assess project viability
- Cost consultant. The role and responsibilities of the specialist preparing cost plans.
- Cost control. How cost plans underpin monitoring, reporting, and variation control.
- Cost of building. Key determinants of building costs.
- Cost reporting. Standards and timing of cost reports.
- Cost variance. Tracking deviations between estimated and actual costs.
- Fair payment practices. Systems and agreements ensuring prompt and equitable payment along the construction supply chain.
- Fees. Charges levied by consultants, professionals, or service providers during project development and delivery.
- Hard costs v soft costs. Brick-and-mortar costs v intangible costs such as fees.
- Key performance indicators. Measurable values used to track performance, highlight trends, and gauge project success.
- Net present value. The difference between the present value of cash inflows and outflows of a project or investment.
- New Rules of Measurement. Standard measurement rules.
- Operational costs. Ongoing expenses required to operate and maintain facilities once constructed.
- Out-turn cost. The actual cost incurred at project close.
- Value engineering. A systematic approach to improving the function of systems or projects while minimising cost, without compromising quality.
Business planning:
- Accounting. Recognition, measurement, and reporting of financial transactions, including capital, costs, profits, and overheads.
- Business case. Information to enable approval, authorisation and assessment a project proposal.
- Change management. The structured process for guiding individuals and teams through organisational or project transitions.
- Development appraisal. An evaluative method to assess a site’s viability, incorporating site constraints, opportunities, and financial return potential.
- Due diligence. An investigative and appraisal process assessing risks, financials, and feasibility before investment or development.
- Funding. The provision of capital through loans, investments, grants, or equity to finance project development or operations.
- Leadership. Directing and motivating teams within projects or organisations to achieve objectives effectively.
- Marketing. Activities undertaken to promote services or properties and attract clients, tenants, or investors.
- Overheads. Indirect costs not directly tied to a specific project output, such as administration, office expenses, or utilities.
- Profit. The financial surplus remaining when all project or business costs including direct and indirect items are deducted from revenue.
- Property yield. The return on investment derived from property, typically calculated as rental income as a percentage of property value.
- Relationship management. Maintaining effective stakeholder engagement to mitigate risks like delays or defects.
- Resource management. Planning and controlling assets; people, materials, machinery, and budgets, to optimise project delivery.
- Site selection and acquisition. The evaluation and procurement process of choosing a suitable site based on factors like location, cost, regulation, and potential.
- Winning work. Strategies and practices used to secure new projects, contracts, or clients.
All articles about costs and business planning
There are more that 1,000 articles about costs and business planning on Designing Buildings. A full index is available here.
You can access our other subject-specific knowledge hubs here.
Stay up-to-date
This hub will be updated regularly with new guidance, policy changes, and innovations. Bookmark this page or subscribe to our newsletter to stay informed.
This web page is openly licensed via CC BY 4.0.
Featured articles and news
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.